We Have Reached the 60% Detailed Design Milestone

A full set of project drawings is under review by RDN engineering and operations. The next step in the design process will be a 90% Detailed Design package, followed by the final Issued for Tender (IFT) drawings and specification package.

Share on Facebook Share on Twitter Share on Linkedin Email this link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>