Why is the trail project being considered?

    • The 2022 Parks and Trails Strategy identified developing trail connections as a goal to improve the livability of the region and wellbeing of its residents.
    • The E&N rail corridor from Englishman River to Alberni Highway is a potential connection between the existing Top Bridge Regional Trail and the Coombs to Parksville Rail Trail. Once the trail is completed, there will be a continuous 16-kilometre multi-use route from Rathtrevor Beach Provincial Park to Coombs.

    Why are trail improvements needed?

    • The existing gravel access road is within Island Corridor lands. It is not designated as a public trail and is not maintained. 
    • There is no formal trail along Alberni Highway to connect Despard Avenue and the railway corridor.
    • There is no formal trail within Top Bridge Community Park to connect the railway corridor and Top Bridge Crossing.

    Is the trail replacing the railway tracks?

    No, the trail will be located beside the tracks.

    How will the project be funded?

    • The 2025-2029 Financial Plan includes $763,163 in the Regional Parks Capital budget funded from a combination of Growing Communities Funds and reserve funds.
    • The project will be constructed and maintained through the Regional Park Service.