Rail Trail from Top Bridge Crossing to Despard Ave in Parksville
The Regional District of Nanaimo (RDN) is planning a new regional trail along the Island Rail Corridor between Top Bridge Crossing and Despard Avenue in Parksville. The trail will connect Top Bridge Regional Trail to the Coombs to Parksville Rail Trail, with the goal of improving active transportation options, increasing recreational opportunities and creating better connections between existing trails.
HAVE YOUR SAY
Share your feedback by:
- Dropping by our pop-up open house on July 29 (3 - 7 p.m.) at the Butler Avenue railway crossing in Parksville.
- Completing the online survey (live from July 22 - August 12).
About the Project
The project includes:
- Upgrading approximately 3.7 kilometres of an existing water main access road between Alberni Highway and the Englishman River. This access road is not currently designated as a public trail.
- Building approximately 0.75 kilometres of new trail to connect the Allsbrook Road Top Bridge parking lot to the railway corridor.
- Building approximately 0.65 kilometres of new trail to connect Despard Avenue to the railway corridor along Alberni Highway.
The project will complete a continuous 16-kilometre trail route connecting Rathtrevor Beach Provincial Park to Coombs.
Before proceeding, the project will require approvals and agreements with the Island Corridor Foundation, the City of Parksville, the Ministry of Transportation and Transit and BC Hydro.
Engagement
The RDN is seeking community feedback to help identify:
- Safety concerns
- Connectivity gaps
- Accessibility barriers
- Important trail design considerations
Residents can review the proposed concept design on the Get Involved RDN project page, attend a drop-in open house and complete an online survey.
What Happens Next?
Feedback received through the survey and open house will be reviewed and summarized to help guide the trail design. A What We Heard Engagement Summary will be posted on this page and registered participants will be notified by email. The final trail design will be posted on this page once completed.
Stay Informed
- Visit the What's New tab for project updates
- Sign up with your email using the subscribe button to receive email updates as the project moves forward
- Check out the FAQs to learn more
- Ask us a question or leave a comment using the Q&A tab below
- Review Project Documents:

Questions and Comments
Questions about the project? Post them here and a member of the project team will get back to you. Please note:
- Please only post questions related to the project here. Information provided here via posted questions will not be shared with the RDN Board of Directors.
- To protect your privacy and the privacy of others, please do not include any information that could identify you or another person. Identifying information could include a person’s name, address, email or phone number. Questions that contain personal information will not be published.
