East Wellington and Pleasant Valley Active Transportation Network Plan
The Regional District of Nanaimo (RDN) is developing an Active Transportation Network Plan for East Wellington and Pleasant Valley in Electoral Area C to enhance active transportation options and strengthen connections to local amenities and services. The plan supports safety and accessibility for residents and visitors of all ages and abilities.
The plan serves as the first step in advancing active transportation in the area. The plan takes a detailed look at existing conditions and identifying opportunities to improve infrastructure that supports walking, cycling and other active transportation modes.
SCHEDULE UPDATE – Please note that Phase 2 Engagement on the draft plan will be held in November. Follow along here for the latest updates.
Why It Matters
Safer Routes - Improve safety for walking, biking and rolling
Better Connections - Link homes to schools, parks and services
Climate Action - Support low-carbon travel and healthy lifestyles
Funding Opportunities - Position the community for provincial and federal infrastructure grant funding
The Regional District of Nanaimo (RDN) is developing an Active Transportation Network Plan for East Wellington and Pleasant Valley in Electoral Area C to enhance active transportation options and strengthen connections to local amenities and services. The plan supports safety and accessibility for residents and visitors of all ages and abilities.
The plan serves as the first step in advancing active transportation in the area. The plan takes a detailed look at existing conditions and identifying opportunities to improve infrastructure that supports walking, cycling and other active transportation modes.
SCHEDULE UPDATE – Please note that Phase 2 Engagement on the draft plan will be held in November. Follow along here for the latest updates.
Why It Matters
Safer Routes - Improve safety for walking, biking and rolling
Better Connections - Link homes to schools, parks and services
Climate Action - Support low-carbon travel and healthy lifestyles
Funding Opportunities - Position the community for provincial and federal infrastructure grant funding
Information gained through the first phase of engagement will be used to develop a draft active transportation network plan, which will:
identify opportunities to improve infrastructure that supports walking, cycling and other active transportation modes,
define the proposed network structure, facility types and connections to key destinations,
outline maintenance expectations and responsibilities associated with proposed facilities and
recommend performance indicators to support monitoring of progress, usage and safety outcomes over time.
The draft plan will be reviewed through a second phase of engagement in September with revisions incorporated before it is finalized at the end of 2026.
Information gained through the first phase of engagement will be used to develop a draft active transportation network plan, which will:
identify opportunities to improve infrastructure that supports walking, cycling and other active transportation modes,
define the proposed network structure, facility types and connections to key destinations,
outline maintenance expectations and responsibilities associated with proposed facilities and
recommend performance indicators to support monitoring of progress, usage and safety outcomes over time.
The draft plan will be reviewed through a second phase of engagement in September with revisions incorporated before it is finalized at the end of 2026.
Attend thedrop-in open house on Monday, April 27, 3:30-7:30 p.m. at Discover Montessori School (3460 Jingle Pot Road) to share ideas, concerns and priorities for walking and cycling in East Wellington and Pleasant Valley
Your input will help identify key routes, barriers and opportunities for improvement.
Engagement has started for the East Wellington and Pleasant Valley Active Transportation Network Plan.
Attend thedrop-in open house on Monday, April 27, 3:30-7:30 p.m. at Discover Montessori School (3460 Jingle Pot Road) to share ideas, concerns and priorities for walking and cycling in East Wellington and Pleasant Valley
Your input will help identify key routes, barriers and opportunities for improvement.
Page last updated: 24 Sep 2026, 09:30 AM
Data Collection and Analysis (March - April 2026)
East Wellington and Pleasant Valley Active Transportation Network Plan has finished this stage
Project team reviews existing background information, including: traffic data, community plans, transit plans and active transportation best practices
Phase 1 Engagement (April - May 2026)
East Wellington and Pleasant Valley Active Transportation Network Plan has finished this stage
Project webpage and first community survey are launched
Meetings are held with interested and affected groups
A drop-in open house provides opportunities for in-person input
Public feedback helps identify safety concerns, connectivity gaps and priorities
Engagement Summary and Draft Plan Development (May - June 2026)
East Wellington and Pleasant Valley Active Transportation Network Plan is currently at this stage
A What We Heard Engagement Summary shares key themes from Phase 1 engagement
The project team reviews feedback and begins drafting the network plan
Technical analysis and design work continue
Phase 2 Engagement on Draft Plan (November 2026)
this is an upcoming stage for East Wellington and Pleasant Valley Active Transportation Network Plan
A second survey is launched and the project webpage is updated to invite feedback on the draft plan
A second open house and follow-up meetings are held with interested and affected groups to gather input
Community feedback helps refine recommendations
Final Plan Preparation (January - February 2027)
this is an upcoming stage for East Wellington and Pleasant Valley Active Transportation Network Plan
A final What We Heard Engagement Summary is shared
Final adjustments are made based on input
The final plan is presented to the Regional District of Nanaimo Board